Finally, that is changing. http://carrollwood.patch.com/articles/pedestrian-pathways-project-begins-soon-along-dale-mabry
This is the area I am talking about:
I frequently ride my bicycle through this area, from my home, a bit south of Bearss Ave. and a bit to the right, to the YMCA on Northdale Blvd., a bit to the left. The new sidewalks will make the ride safer and more pleasant.
New concrete segment on east side of North Dale Mabry Highway, north of Carrollwood Springs Blvd. to Zambito apex. On the right is a small wetland mitigation area, the blue triangle on the map where Zambito meets North Dale Mabry.
Wetland Mitigation Area
Bridge from north end of new segment back to preexisting sidewalk on east side of North Dale Mabry, south of Northdale Blvd.
Entrance to Northdale subdivision, on west side of North Dale Mabry Highway. New boardwalks are being built both north and south of this entrance.
Looking north from Northdale Blvd., on the west side of North Dale Mabry Highway. New boardwalk under construction over ditch. Most of the new sidewalks are of this form. Evidently there is not much space available to build concrete sidewalks.
Looking south from Northdale Blvd.
South end of section shown above (looking north, on the west side of North Dale Mabry Highway.)
At Carrollwood Springs Blvd, on west side of North Dale Mabry Highway, looking north.
A completed segment of boardwalk on west side of North Dale Mabry Highway, at Bearss/Ehrlich looking north. I rode this section on my bicycle for the first time today.
1 comment:
Test.
Post a Comment